MODELLING GUIDE·WHITE DWARF 360
Building the Fortress of Redemption
December 2009·pp. 78–81
THE SHORT VERSION
Preparation removes mould lines before the large walls are joined. The tower, weapon platforms and walkways are assembled in a sequence that gives important bonds time to set. Leaving selected fittings loose preserves options for the silo and lascannon. Drilled and cut damage gives the finished walls a sense of previous fighting.
EXPLORE RELATED TOPICS
Back to the original
Find this article in White Dwarf 360, pp. 78–81.
This is an original summary. Refer to your magazine for the complete article, rules, images and painting steps.